| Job Order Information |
|
Date Ordered:
Company
|
| Job Description |
|
Job Description:
How close can the truck park to the actual dig location?
Does T-Rex need to cut asphalt or pavement? Yes No
Restoration: Backfill No Yes
If Yes, indicate type of material:
Grass Cold Patch Concrete Core Replacment
Total Depth of Excavation:
Job Duration
Are FRC's required of T-Rex personnel for this project? Yes No Directions to Site Location
|
| Safety Meeting Information |
|
Time of Safety Meeting:
|
| Water Fill |
|
Water Fill Location:
Dump on Site: Yes No
If no Dump Location
|
| |
| Billing |
|
Billing Instructions:
Unless otherwise noted, client will be responsible for all traffic control, one call and any excavating permits/permission from surface owners and other utility providers, both on and off the right of way.
Client agrees to take responsibility for any contamination found in soil/spoil and will reimburse T-Rex for disposal. |
| |